top of page
Project 1 - IBS System (Group)

Assignment 1 is a group project which is related to the topics on Industrialized Building System (IBS). Each group of us is required to design simple apartment units using IBS construction system. The objective of this project is to expose and engage us in a critical and analytical study of the different IBS construction methods and engage us to assessment of IBS scoring. Accordingly a model shall be produced together and the assemble will be a whole series of process of the model making.

Model making of Industrialized Building System on the apartment

Project 2 - Construction solutions (Individual)

Assignment 2 is aligned with our studio' design project which aims to facilitate them in the technical studies of our design. Consists of two parts, the first part deals with the analysis and establishment of the structural and the envelope systems of our's design. This is to ensure that the design has logical and workable construction systems and at the same time encouraging us to include construction as part of the design and not just "tools" to build it. The second part is a continuation from the first where we have to implement it in the design. The main drawings for this part will be the detail sectional drawing of the design which is also one of the requirements of the design studio.

Construction detail of community library design

bottom of page