PAUL WONG | 0331208
Project 1 - Temporary bus shelter
Working of 4 person in a group. Required to produce a shelter based on the understanding of skeletal construction and its joints. It should be made out of specific recycle materials that reflects the materials used in actual construction. The shelter will be tested to determine its strength and students will be required to analyze the success or failure of their shelter.
Philosophy/worldview of the CHINESE vernacular architecture - SI HE YUAN
Project 2 - Structural construction model
Based on the concept taught in class which is either grid shell and tensile construction methods. It will involve a relevant case study of a building of our choice. We required to dissect a model of their choice and come up with an analysis of the construction methods used in the building and analyzed comprise structural system, material, function and load distribution for the building.
Munich Olympic stadium - Tensile structural